Our House

Tuesday, January 29, 2008



On Sunday Peter and I went to the house to try to finalize the 1st floor paint colors. We were also anxious to see the progress since last Wednesday. We are still unsure about colors for living room, dining room, pantry and family room. But everything else is looking good.

Once the floor was finished in the laundryroom I was afraid the color I had picked for the walls would be too orange. But I think it'll be fine:



The painters were on the 3rd floor doing the trim. It really makes a difference to have that done. Next, I guess they'll paint the doors and then stain the built-ins.



Speaking of built-ins, the window seat in the living room is almost done. I am very relieved that it is pretty unobtrusive,not overtaking the room. And there will be a fair amount of storage. Yay. The seat itself is so long that I think I will have 2 cushions on it. And the new edge around the old built-in cabinets looks great. Our team is so good with details(along with everything else).



The doorway to the basement was blocked. I guess Bob didn't want anyone walking on the tiles. But we're the home owners, so we removed the barricade and went tdown to see the floor. We stayed on the stairs out of respect (and fear). Unfortunately, all the cutting equipment was on top of the tile 'rug', so I couldn't get a good shot of it. But the dots are coming out nicely in the 'pantry' area.


When I saw Bob on Monday, he said we got lucky, and the dots just mess the toe-kick of the built-ins by a few inches. I know that it's skill, not luck. Also on Monday, Bill and Katelyn got busy in the dining room making the new built-in cabinet. Actually, this photo only shows that they got busy destroying the old one, but I have confidence that a new one is on the way.


And Kenny is reversing hinges and door knobs on the doors that we want to have swing the other way.



I am meeting with Laura this morning to go over the changed plans for the side yard wall and landscape and hopefullystart talking about the front. Too bad about the snow on the ground. I'm getting a little tired of this charming New England winter. I hope the groundhog gives us an early Spring.

Saturday, January 26, 2008

Tiling progress and more about the well

I was very happy to see that Bob actually did draw out the design we made for the tile under the pool table. The idea is to have it look like there is a rug, but it is made out of tile. I haven't seen the final result yet, but from what I did see, I think we got it right.



I guess it's completed now and I think Bob was doing the area at the bottom of the stairs today. I can't wait to see the whole thing. Hopefully it will inspire me to choose the paint colors for the whole lower level.


The tiling is also finished in the laundry room - I guess I don't have a photo of it c ompleted, but I think it looks alot less busy now that it's done than it looked when it was in process.


So the well diggers are gone. They packed up their gear, emptied the red container of all the muck, and left. They told Lee we are getting about 50 gallons per minute which is better than excellent. I guess they consider about 10 gallons a minute to be adequate. This means we will have no problem using the water for our irrigation system, and if we ever want to, we can use it for our house water. The next stepis for the well guys to install the piping and pump. They came yesterday to begin with the shroud pipe (sounds deadly) which will go from the well up to the pump and into the house. That should be finished on Monday. Then they can install the pump which may have to run for a couple of days to get the water clear. Then a sample is taken to make sure the water has no bad stuff in it. If it does, we'll have to filter it. THEN, we can get the inside equipment installed, hooked up to the pump and - ta da- central heat!!!



While I was outside taking pictures, I decided to warm up in the mason's tent. They are moving along with the stone wall and the stairs to the deck.

Finally - big news: Lee said that Peter's vanity was scheduled to be finished yesterday. Hopefully he will pick it up on Monday. Can't wait to see it. I really hope it fits.

Another busy week

Joshua came to visit us this past week. Sarah and Jon brought him here, and on Sunday we took them to see the house. I think they approve. They gave us their opinions on the paint choices, although I don'tknowif I'll listen to them any more than I listen to Peter. Joshua was really more interested in the snow outside.



Francisco the painter was there. He was working on the 3rd floor closets and also he put a second coat on the bedrooms and did the bathroom. In spite of what they say about the Ben Moore new paint, it seems that 2nd coats make a difference










Bill and Katelyn have finished the panelling in the front hall powder room:





Now they are working on the window seat in theliving room while Kenny is fixing the existing built-ins. I was a little nervous that putting in more built-ins would crowd the room, but it looks like it'll be fine.




In the basement, Peter and I had realised we made a mistake about the storage space under the stairs. I guess we had forgotten how it was before, so we didn't realize that the new way was very intrusive until we saw it. We spoke to Lee about it, redesigned it, and it will be more like the original, only better, of course. Lee will actually construct it so there is proper support. We will still have some storage directly under the stairs, but we will have more floor space and a less cramped feeling as we come down the stairs. Eventually, there will be no support studs, jsut open space.

There's more to tell, but I'm afraid blogger won't let me put on more photos, so I'll continue in another entry.

Thursday, January 17, 2008



Well, I guess we can move in now - the ironing board has been installed. It looks very nice and I figured out how to lower and raise it and how to lower the little arm thing. I'm hoping it comes with instructions how to actually iron, or better yet, maybe it will come with a person who will do the ironing.








Bob and I spent alot of time in the basement trying to figure out a tile pattern that will work. Actually he did the figuring, while I just stood there nodding and pretending that I was following all the numerical things he was saying. I had no idea one had to know so much math to do tiling. After a bunch of measuring and marking, he finally said we had something that will work. I really hope he wrote it down, cause I doubt we'll be able to re-create it from scratch.








Upstairs everyone was very busy:




Kenny is installing thresholds








Matt is finishing up the grouting in Peter's bathroom








Next, he can do the vestibule since Bob has finished the tiling there








Rich is either cleaning the top of the kitchen cabinets or installing crown molding. Either way it's a worthwhile task








And Katelyn is taking a much needed coffee break








Outside, the well diggers told Lee that they are getting lots of water so there will be no problem using the well for the sprinkler system as well as the HVAC. That's really good news. They got down to about 300 feet and the goal is 1000. It's slower going now with all the water, but hopefully they'll be done by early next week. Looks like we will have central heating in the house before it gets hot outside!









I'm not entirely clear on how the digging process works, but once they hit water, I guess it has to be removed as they continue digging. So the water is pumped out along with grit and muck from the grinding of rock. That all pours into the red bin which then strains out the water and sends it back into the ground elsewhere ( in our case, it went through that green hose into a pipe that is planted under the trash can cover.
More on the process in the next entry since probably no one will read this one again.

Tuesday, January 15, 2008

I'm diggin' it and so are they...

Big drill:


I had a very pleasant surprise when I got to the house today: the well guys were there and they were drilling! Since I had already convinced myself we weren't going to see them til the snow melted, it was a bit anti-climactic. But it is an impressive process. The main driller-guy (I don't know their names yet) said he got down about 47 feet and then he hit stone ledge. The rest of the drilling will be throught ledge. But this is what they had anticipated, so they are prepared with the proper bits. With any luck we'll have a well by the end of the week.






The other activity outside was the masons. They are continuing on with the stone garage walls inside their green tent. Apparently they burn the stone into the wall:



Mike was laying bricks on top of the cinderblocks which are the platform for the stairs. At first I was confused because I didn't remember that we were having a brick walkway there. Then he explained that he needed another 2 inches of height on the platform, so he just used the leftover bricks. It will all be hidden by the stairs.



There was a near-emergency situation early this afternoon: The masons have this need to be warm all the time so they constantly have electric heaters going. They say it's for the stone - maybe it is.. The power on the street went off at around noon time. After about an hour it was getting pretty cold in the green tent. Lee went off to rent a generator and Bill asked the well guys if the masons could borrow their generator. Lee got back with a generator and naturally the power came back on. I'm pretty sure no harm was done.

Inside, things are moving along nicely.

Peter and I met with Daniel who is doing the refinish of the woodwork. He's doing a super job - respectful of the age of the house and of our need to have things look just right. He's managing to keep age-related flaws and do away with man-made flaws.


Bob has begun tiling the vestibule. He has a couple of challenges - cutting around the heat registers - but I know he'll make it look great. Meanwhile, Matt is upstairs grouting Peter's bathroom.



And the study is going to be just what I had envisioned. Katelyn is adding a piece of molding to the crown which makes it a bit more substantial and is busy doing the detail in the panelling.



We had a little problem in the basement. When they closed in the stairs and allowed for storage underneath, the structure seemed too bulky and intrusive to us. So Peter and Lee and I talked about it and came up with a change that will make us much happier. I don't think it means redoing the WHOLE stairway.



All in all, a good day.