On April 2 the stone installers came to install all our countertops. They had 5 different locations to do and we figured they'd be here all day. These guys were awesome. There were at least 5 of them, they showed up before 9:30 (like they said they would) and were actually finished and out the door by 1:30.
Since I am short of time, I'll let the photos do the talking:

The basement built-ins:

The wet bar in the indoor/outdoor room:


The laundry room:


Peter's bathroom:


The Den:




The take-out window in the kitchen:

The bathrooms are coming along with shower doors and plumbing installed; the carpet is in on the 3rd floor; the painting is nearly done; electrical is moving along and the HVAC is close to ready for testing.