Our House

Friday, January 26, 2007

I had a short meeting with Lee this morning. Miriam was going to join us, but she was busy getting the updated plans ready for the printer. That's what she said, although Lee and I suspect she just didn't want to come out in the cold. We builders laugh at extreme weather, but I guess architects are a bit less hardy.

We decided that in Emily's room we will change the position of the door which will allow for a hanging pole that is accessible instead of the 2 short poles that were there before, one behind the other so it was impossible to see what was hanging there. There should also be enough room behind in the knee wall for storage. Originally we had planned that all the doors in Emily's room would be bead board, but now that there will be more doors and most of them will be standard height, I think we'll go with panelled doors, and maybe even real doorknobs.

Lee has been talking with the insulation guy who is recommending a solid foam insulation that is highly effective both for cold and for moisture. Between proper insulation and a well-balanced HVAC system, we might actually have a house that is comfortable in every room at the same time. And maybe the gas and electric bills will go down a bit. Or maybe that's too much to ask.

In the basement, the team was busy taking the ductwork down and smoothing out the floor (more sloshing than smoothing I think).


Two pallets of bluestone were delivered for the steps to the vestibule. The masons are supposed to start that next week. I hope it won't be too cold, although they still have the blue cocoon. And I believe the copper roofs are going to begin to be installed on the bays. We've decided to go with the lead-coated copper which hopefully will stay a rich gray color, unlike the red copper that turns brown and then green.


I stopped by the house yesterday on my way home fromNew Jersey because I was curious to see the house without the front door structure. Actually, it hasn't been taken down completely yet. Lee discovered that the pillars are probably made of solid concrete and are in good shape. So the question is do we keep them or go with the plan to construct new ones. We had planned tht the new ones would house the drainage system for the deck above, and that can't happen with the existing pillars. On the other hand,Lee is loath to destroy something that is perfectly good and I can't disagree. In the mean time, they did a great job wrapping up the wisteria and making a comfortable bed for it .








Up on the third floor, the framing is going great. In Sarah's room you can see where the new closet will be and where the space of the old closet can hold a dresser 30 inches wide by 22 inches deep by 56 inches tall (Lee and I measured the space but neither of us had pencil or paper with us so I'm putting it here). The wall where the closet is will pretty much be a wall of doors: 2 for the closet, one for the main storage space under the eaves, and double doors where the built-in bookcase was to allow easier access to that area under the eaves. Later, we'll decide if we want to put shelves behind the doors.







I went down to the blue cocoon to see what's going on and found Mike the mason just kind of standing and admiring his work . And with good reason, it looks great. There is a new retaining wall of fieldstone to match the foundation walls. And he said that nest week they will put the bluestone on the stairs. The landing by the vestibule currently has an orange floor. Very colorful; maybe we should keep it...









They guys were just finishing up digging up the floor in the garage which means soon they can begin doing the drainage and plumbing pipes and then put in the floor and then start framing the walls. There are huge piles of clay and concrete, almost a story high, that represent the old floor in the basement and garage. They have put up a lovely temporary door to the garage in a green color that goes nicely with the orange. Very cheerful, if not exactly the sophisticated look we had in mind.






Wednesday, January 24, 2007

Major destruction

I got a phone call from my neighbor, Rebecca, this afternoon. She told me she was walking her dog by the house today and saw the guys taking down the structure over the front door. I guess she just wanted me to know in case that wasn't in the plan. Meanwhile, I'm starting to be suspicious that Lee isn't completely comfortable with my building skills (or destructing skills). He's managed to take down parts of the house every time I am out of town so I never get to help. Or maybe he just wants me to be able to see really huge changes after I've been away for a few days. Or maybe he was just taking advantage of the fact that it wasn't snowing or -10 degrees outside today.
Whatever the reason, I am really anxious to get back to see it and to take some photos. I wonder if there is a plan for rebuilding...

Joshua becomes newest member of the team




Peter and I went to the houseover the weekend to see what's new. The wood ceiling in the kitchen is gone as well as the wall leading into the kitchen. Soon we'll be able to figure out what to do for the entrance and above the cabinets. I don't think we'll put in more cabinets, probably just crown molding and uplighting. Hopefully the beam across the entrance can go into the ceiling to give us more height.




Joshua and I went to the house on Tuesday to check out the progress. The third floor is starting to get framed out so it doesn't look like one huge space anymore.

Lee put Joshua to work. Apparently he's a pretty good carpenter. Unfortunately we couldn't stay very long, but Lee said he'd give a call if he needs Joshua's help again.


I won't be back to see the house again til Friday. I'm sure there'll be something new to see.

Friday, January 19, 2007






The basement floor continues to be dug up. Lee found some pieces of coal, so either that well became a place for a coal furnace or there is a diamond mine there. We're also considering bottling the water that is now covering the floor and selling it. We can even give tours of the fabulous spa-like conditions. Anything to help defray the costs.


.
They have framed out the new guest room and laundry room and upstairs back hall. It's looking very good but the back hall seemed a bit smaller than we hoped. Peter had a great idea to open up the stair well at the top and just have a railing instead of a wall. That will make a huge difference in the feeling of space there and Lee and Miriam agreed. Originally the back stairs led up to the servants rooms and bathroom so I guess it didn't matter to the homeowner that it was small and a bit dark. The down side to our opening it up is I guess this means we are not going to be having servants. Too bad.
This is a view of the guest room taken from the bay so you can see the closet all the way on the right and where the built-in dresser will be to the left of the closet and beyond , where the windows are, is the laundry room.



We also spent alot of time discussing where to build in the ironing board in the laundry room. Peter and Miriam were very serious about which way the board would face and if the door to the room would have to be closed during ironing and if that's a bad thing. I don't know how much ironing they think is actually going to go on here.

The third floor now looks like a dormitory in a very run down school. Most of the walls are down and the ones remaining are only studs. I'm glad we decided to do the third floor now even though it wasn't in the original plan. Lee found that the roof was still leaking by the chimney in Sarah's room and alot of the studs and rafters were compromised by water damage. So everything will get fixed and some sketchy wiring will be brought up to code.

We decided in Sarah's room to make the existing closet into an alcove for a dresser since it was under an eave where we couldn't even have a full door or much of a hanging rod. A new closet will be built with better headroom and reasonable hnging space (for a visit).
The 'sharing closet' will get some of the space from Sarah's old closet for shelves and we are moving the door around the corner which will allow good hanging space and easy access to the new shelves and better play area in the hallway.

The only troubling thing at the moment is the positioning of the powder room and coat closet in in the addition. If we leave it the way it is there is an issue with getting the plumbing through the foundation in the basement. If we flip it, some people think it closes in the entry from the vestibule to the family room. Peter and I will go look again and decide by Monday. I have a feeling it will end up staying the way it is and we will have to have some bracketing for support underneath. Lee said he will do a mock up of the bracket so we can get an idea of how that will look in the carport.

We also have to decide about the copper roofing for the bays - should it be the untreated copper which eventually turns brown and then green. Or should we go with the lead coated which is gray and weathers to a milky color. Originally I wanted the lead-coated but when we put the samples up to the new trim color, it seemed the brown copper was better. Then when we put it against the roof, the lead was better. So that decision also must be made soon. This photo shows the trim color with the 2 copper choices leaning against it and the bluestone that will be on the walkways and terraces.


I won't even start about the toilet decisions. I'll save that for next week.

Tuesday, January 16, 2007




It's time for some serious catching-up. Alot has gone on in the past several days; I'll try to remember everything.
I think we finalized a design for the sink/closet area in Emil's room on the 3rd floor. It includes expanding the bathroom by 11 inches which will hopefully make it easier to design shower doors that can open without smashing into the toilet. There will be a 3 foot closet and a 4 foot sink in the bedroom which is actually quite a bit bigger than what was there before. That's because we took down the partial chimney stack that was just sitting on a platform behind the wall.

On the second floor, Katlyn and Mark started to remove the existing beam in the old guest room to replace with a hidden beam that will be inside the ceiling in the new guest room and laundry room.



In the basement it was discovered that the tunnel with the 'pipe' in it is actually just a tunnel - no pipe - but it goes from the well to the outside of the house. And it is nicely lined with brick on both sides. We might take the brick to use in some of the outside walkways, although since it has been underground forever it hasn't weathered and doesn't exactly match our existing outside brick.

Outside the house there is lots of progress. The roof of the addition is finished and looks great. And finally I got to see the stairs leading up to the vestibule. The whole blue cocoon area is really neat with all the stone work. Lee and I were trying to figure out if we could turn it into a room, but we agreed that would make access to the house from the carport a bit inconvenient.


I stopped by the house yesterday, not really expecting to see anyone since it was a holiday. Lee and Bill and Katelyn were there doing more demolition on the 3rd floor. I didn't have my camera with me so I will go back today to take photos.

Tuesday, January 09, 2007

Roofs and ceilings and floors

There's been alot going on the last few days, literally from top to bottom. I'll start from the top and work my way down to the depths of the basement.

They have begun shingling the roof on the addition. I had a couple of packages of the shingles we used when we redid the roof several years ago, so Lee was able to get exactly the same ones. I have to admit that I was pleasantly surprised to see that they match the existing roof exactly. I was expecting to see differences due to weathering and figured we'd have to wait a few years for the new roof to catch up to the old one. But it looks like we got lucky.

In the den, they've started shaping the domed ceiling which has been designed to match the ceiling in the front hall. As Lee and I walked in to take a look, I heard Mark say to one of the guys, "make sure it looks good." I'm pretty sure that's builder-speak for "make sure it's structurally sound."

Last Friday they did pour the concrete for the vestibule landing, but it's been under wraps to keep it safe from the elements. I tried to take a picture, but it doesn't really show anything. I saw Mike the Mason today who had actually come out of the blue coccoon for a few minutes. He said they are building the 2nd set of stairs leading up to the landing. It was too tight for me to get inside to take a picture, so I guess it'll have to wait til the big unveiling.


There are more interesting discoveries in the basement, although still no buried treasure. When we moved into the house 25 years ago, there was a slightly raised circle of concrete kind of in the middle of the concrete floor. We had surmised that perhaps it had something to do with the original heating system in the house. When Lee saw it last October, he suspected it might be an old well. The team has started jackhammering the floor of the basement to take up the concrete in order to do a bunch of stuff - French drain, re-route pipes, etc - before putting down a new floor. They discovered a tunnel with brick sides leading from that circle, which Lee has confirmed was a well, to the outside, In the tunnel was a fairly good-sized pipe. Probably it was an escape route for runaway slave mice back at the turn of the century. Lee and I were thinking maybe we could find some bones and check the DNA. Or, maybe it was just an overflow pipe for the well. One thing is certain: under the concrete was just the clay that is the basic soil on our property, and it was damp. Maybe that explains some of the dampness in the basement. The new floor will have proper drainage, so we will be nice and dry and no musty smell.


Saturday, January 06, 2007

A good start to the New Year



I didn't get back to see the house til the Wednesday after New Year's. The team has been very busy: the new bays in the family room and in the upstairs guest room have been framed out. There was a small bump when Lee told me the sides of the upstairs bay would be too small for windows. But when we looked at it, it seemed ok to not have the windows on the far sides. It actually might work out better that way for privacy, but Peter and I will go tomorrow to take a look.


The heat pump has been removed from the bathroom closet, and they were able to do it without breaking down the hall wall. That was a bonus. It'll be so nice to have a closet in that bathroom.

The 3rd floor is completely down to studs so it's easier to make a few decisions: we will widen the hall to Sarah's room by 6 inches; we will not make the bathroom any larger; we will reconfigure the sink/closet arrangement in Emily's room to maximize closet space (for us, Emily, not for you).

On Wednesday, when I went into the blue cocoon, it was a bit chilly and the masons were actually wearing sweatshirts and gloves. Apparently they had run out of diesel fuel. Fortunately, all was warm and snug by Thursday. The walls really look terrific and I think soon they will put the final mortar on to match the original foundation.

The Thursday meeting was productive: we chose a trim color for the exterior and settled on complementary brick/bluestone patterns for the walkways to the frontdoor and to the vestibule. When I arrived before the meeting I found Lee and Mark actually looking at the plans. I took a picture to show Miriam. I tried to get a shot when they weren't pointing and laughing...


And Katelyn is back to cleaning duty.

I stopped by on Friday morning, but it was too early to see any changes. Lee was busy measuring and cutting. I don't know what it's for, but the sparks were impressive. He told me the concrete guys were coming back to pour the area to the vestibule. I'll have to miss the action, but I'm anxious to see the results.