We decided that in Emily's room we will change the position of the door which will allow for a hanging pole that is accessible instead of the 2 short poles that were there before, one behind the other so it was impossible to see what was hanging there. There should also be enough room behind in the knee wall for storage. Originally we had planned that all the doors in Emily's room would be bead board, but now that there will be more doors and most of them will be standard height, I think we'll go with panelled doors, and maybe even real doorknobs.
Lee has been talking with the insulation guy who is recommending a solid foam insulation that is highly effective both for cold and for moisture. Between proper insulation and a well-balanced HVAC system, we might actually have a house that is comfortable in every room at the same time. And maybe the gas and electric bills will go down a bit. Or maybe that's too much to ask.
In the basement, the team was busy taking the ductwork down and smoothing out the floor (more sloshing than smoothing I think).
Two pallets of bluestone were delivered for the steps to the vestibule. The masons are supposed to start that next week. I hope it won't be too cold, although they still have the blue cocoon. And I believe the copper roofs are going to begin to be installed on the bays. We've decided to go with the lead-coated copper which hopefully will stay a rich gray color, unlike the red copper that turns brown and then green.