The deliveries were only a small contribution to the hustle bustle going on at the house.
The painters have arrived to do the 1st 3 floors, and immediately got involved prepping for the prep work. They covered the floors with plastic, then with heavy duty paper. I know they were doing it for the painting, but I feel alot better that the floors are more protected from scratching. I just hope everyone is still careful about gouging. The painters also sprayed the windows with a film that will protect them (the windows) and make it easier to spray the paint on the trim. I guess it just peels off after and we have perfect trim and paintless panes.

And Peter and I have finalized all the paint colors except the living room. I'm very impressed with us.
Paul is the lead guy of our painting team. He and his crew are sanding their little hearts out. There's so much dust that Daniel had to stop doing his refinishing. He'll be back when the dust settles.
Francisco is still up on the 3rd floor, finishing up trim work and beginning to stain the built-ins. We decided to stay with the color selection for the 3rd floor hallway. Once the carpet is down and there are pictures on the wall, I don't think it will look like Sarah's room is the same color
Also, up on the 3rd floor, the closet that will house the air handler is being cleaned out. I guess Lee still believes that one day we will have central heat and air. I have my doubts.
Outside, the garage wall is almost finished, and the stairs are about half done. I like to climb up the stairs to view the back 40. Can't wait til there's also a deck up there and some railings.


Back in the house, Bill and Katelyn installed the built-ins in the den. We've decided to definitely go with a stone countertop. Peter made a selection that looks great, and I think it will be better to break up all the wood in there.


The plasterer's are back doing touch-ups throughout the house and finishing work in the basement.

Lee has decided to put the screws to the living room ceiling. He's jacking it up, and putting screws in to re-attach it to the floor joists above. We're hoping this will make it high enough and secure so we don't have to tear down the whole ceiling and redo it.

Every day is a little bit like Christmas with new packages to unwrap. We've got the laundry basket for the 3rd floor built-in hamper (now we just have to build the bult-in hamper)

And Lee got to open the boxes for the sinks for the laundry room and wet bar. It's fun to see things so long after I had selected them since I have no recollection of what I chose. So far, I am pleased, and so far everything fits.


And the front hall is filled with all the plumbing fixtures that Lee picked up. We have toilets galore.

And Ken is down in the basement, working on the stairs, so they'll float but they won't fall down..

And finally, Lee and I couldn't figure out what these belong to. The taller ones, leaning on the wall on the left are the doors to the cabinet below. But there are 3 smaller doors or drawer fronts leaning against the back wall. Whoever figures out where they belong (not including Katelyn or Bill who hopefully know) gets to be the first to stay in the coveted lower level guest room.